QHRRP 5000-535

Dock Pilings

 

Review/update responsibility
Architectural Review Board (ARB)
Revision
09 Nov 2026 (CH3)
Reference
CCRE Article V

CCRE Article XII

Florida Statute 720.3035

St. Johns River Water Management District (SJRWMD)

QHRRP 5000-030 – The Island at Queen’s Harbour (Unit 24)

Policy
Pilings (structures used for additional boat tie-up) are permitted subject to approval by the designated authorities listed below.

  • Materials: Pilings must be non-toxic, as required by CCRE §12.4(g)). Only Eco piling, prestressed concrete, or other non-toxic synthetic materials may be used within the waters of the Lagoon system.
  • Caps and Piling Fenders:  Caps are required.  Pilling fenders (vertical strips made of composite or synthetic materials) are required on concrete pilings.
    • Piling fenders must stay out of the water. On stand-alone pilings, the bottom of the piling fender may extend no lower than 7.0 feet mean sea level (MSL). On pilings built into a dock, the bottom of the piling fender may extend no lower than the bottom of the dock’s edge board.  On pilings that guide a floating dock, piling fenders may not be installed where the dock’s pile guides travel (see QHRRP 5000-555 Floating Docks).
  • Strength: Pilings must be of sufficient section and length to withstand forces anticipated from vessel and wind loads.
  • Height: Pilings integrated into the dock must not exceed 5 feet above the horizontal surface of the dock.
  • Lighting: Stand-alone pilings  must be equipped with either battery or solar powered cap lighting.
  • Setback:  Pilings must be a minimum of 10 feet from the side property lines as extended into the Lagoon, unless a variance is granted.
Approving authority
Every Dock, Lift, Piling and Bulkhead Application & Permit (QHFORM 5000/4) must be submitted to and approved by the:

  1. Harbourmaster
  2. Director of Marina and Harbour
  3. Architectural Review Board (ARB)
What to submit
Property owners must submit these documents to the ARB for approval:

  1. Dock, Lift, Piling, Bulkhead Application & Permit (QHFORM 5000/4).
  2. Two separate checks payable to Queen’s Harbour Yacht and Club Owners Association (or QHY&CCOA, INC.); a $25.00 review fee and $100.00 deposit.
  3. A copy of the most recent lot survey, marked up by hand or digitally, showing the existing dock and the location of each proposed piling, with the distances from each piling to the side property lines as extended into the Lagoon.
  4. A sample or product brochure identifying the proposed materials, manufacturer, color and style.
Help
If you have any questions, please contact the ARB Coordinator at 904.221.8859 or email ARBcoord@qhycc.com.